RASHTRIX 24X7 NEWS

India · Rashtrix Wire

India's first bullet train to start operations by 2027

India's inaugural high-speed rail service between Surat and Vapi is scheduled to begin operations in 2027.

India is set to launch its first bullet train service in 2027, connecting Surat and Vapi in Gujarat over a distance of nearly one hundred kilometres. Railway Minister Ashwini Vaishnaw stated that the entire Mumbai-Ahmedabad corridor will not open at once, but will be launched in phases. The National High-Speed Rail Corporation Limited is overseeing the project.

The initial phase will operate between Surat, Bilimora, and Vapi, after the route was extended from the original plan of just Surat and Bilimora. Upon completion, the full project will connect twelve stations, including Mumbai and Ahmedabad, boosting both business and tourism in the region.

A major highlight of the project is the homegrown B28 trainsets being manufactured at a factory in Bengaluru instead of using Japanese Shinkansen rakes. The eight-coach train can accommodate around five hundred and fifty-seven passengers, featuring both standard and executive classes. Amenities include rotating reclining seats, wide windows, and modern passenger information systems.

While the commercial speed will be two hundred and forty-nine kilometres per hour, the tracks are designed for much higher speeds. The journey from Mumbai to Ahmedabad will take under two hours, significantly reducing the current road travel time of seven to eight hours. Final trial runs are expected to take place around the middle of 2027.